Vai al contenuto

Questo contenuto non è ancora disponibile nella tua lingua. Viene mostrata la versione inglese.

KA-01188

How can I check whether the meter box on site is suitable for installation of a specific charging station?

This step-by-step guide will help you with [insert topic here]

CheckRequirementsMeter boxSurveyOnsite

Overview
It is important to do a good survey of the location before installing a charging station.

The capacity (in Amps) of the connection and how much of it is still available for the charging station must be carefully examined.
When sufficient capacity is not continuously available, it is advisable to apply Active Load Balancing.
Find more information on ordering an Active Load Balancing license key.

The installation must comply with local laws and regulations. Pay attention, for example, to the requirements regarding selectivity.

You may also want to check:

Questo articolo è stato utile?